Client
Greek State
Area
Drosochori – Arachthos / Greece
Status
Completed
Year
2009
Description
The Arachthos T8 Bridge consists of two nearly parallel branches with a composite continuous metal deck, spanning a total length of 650 meters. The bridge has a total width of 1370 meters, including two 375-meter-wide traffic lanes, a 250-meter emergency lane, two 100-meter pavements for the express lane, a 125-meter emergency lane, and two lateral lanes measuring 50 meters and 95 meters.
Katakolo Bridge
Our team constructed a Steel Pedestrian bridge on the Port of Katakolon...
Kleitoria Bridge
We constructed a bridge connecting Kalavrita to Tripoli...
Ovrya Bridge – Ring Road of Patras
Construction of composite bridge for the Ring Road of Patras restoration project...
Sarande Bridge
Construction of the new bridge over the Lumi I Bistrices River...
Konispol Bridge – Road Section SH97 Konispol – Vlore
Steel construction of the bridge on the SH97 road connecting Konispol to Vlore...
Memaliaj Bridge – Road Section Levan – Tepelene
We constructed a bridge in Tepelene with a steel-concrete composite central span...
Harakas Bridge
Constructed a bridge to restore a subsided section due to a tectonic fault...
Tsakona Arch Bridge
K.Liaromatis constructed one of the largest arched bridges in the world- Tsakona Bridge...